dengchengen@ahrizhen.cn +86 133 4299 9511 Mon–Sat 08:30–18:00 (GMT+8)

Turning process experience into repeatable machines

Engineering, machining, assembly, integration and run-in closed across three sites.

10,000 FLOOR AREA ㎡
3 PRODUCTION SITES

Engineered in Dongguan, delivered to global lines

HQ engineering, two production bases and in-house testing close the loop from drawing to volume build.

Dozens of senior mechanical and electrical engineers
Engineering

Dozens of senior mechanical and electrical engineers

Mechanical, electrical, vision and process teams work in parallel with ¥30M annual R&D spend, turning process know-how into standard machines.

3,000M CNY/yr R&D spend
4 teams Engineering
Dongguan · Ji'an · Lu'an working as one
Plants

Dongguan · Ji'an · Lu'an working as one

Over 10,000 m² of floor space with machining, sheet metal, assembly and line integration zoned separately for parallel builds.

10,000 ㎡ Floor area
3 sites Sites
Quality

Full-line integration and continuous run-in before shipment

Every machine is calibrated, run continuously and safety-checked before shipping, with engineer-led follow-up after delivery.

100 % Pre-ship run-in
48 h Response time
Full-line integration and continuous run-in before shipment

Three sites, one workflow

Headquarters · R&D and final assembly

Dongguan, Guangdong

Line integration and pre-shipment burn-in take place here.

Production base

Ji'an, Jiangxi

Established 2024-08 for single-machine and standard-series volume build.

Production base

Lu'an, Anhui

Established 2025-04 for machining and structural parts supply.

Systems and patents

IATF 16949

Automotive quality system

Quality system for OEM and Tier-1 supply chains

ISO 9001

Quality management

Design, build and service under control

CE

EU conformity

Machine safety and EMC per EU directives

PATENT

Invention & utility patents

Covering strip-crimp, ultrasonic welding and connector mechanisms

Inside the factory

Workshops, assembly areas and the test lab, in daily operation.

Numbers you can audit

25 s / unit AC line cycle time
16 s / unit Standard station cycle
12 operators Operators per line
8,000 M CNY Annual revenue

Send us your cycle time and cable type
an engineer replies within 48 hours

Single-station replacement, line upgrade or turnkey plant — we assess the process first, then the machine.

Download catalog
Deng Chengen · Sales Director dengchengen@ahrizhen.cn +86 133 4299 9511
Email us