新国标超声焊接交流枪自动线
BYD
2024
DELIVERED
EV Charging
INDUSTRY
CHALLENGE
On site
GB/T 20234.3 demands higher weld strength — manual yield only 96%.
SOLUTION
Station design
Replaced manual with EVT-I ultrasonic welder + auto loading + in-line pull-test.
RESULT
Delivered
Weld yield lifted to 99.7%; cycle 6s to 4.5s.
Send us your cycle time and cable type
an engineer replies within 48 hours
Single-station replacement, line upgrade or turnkey plant — we assess the process first, then the machine.